Inducode can offer a complete turnkey solution from the design stage right through to commissioning. The Inducode solutions includes the following: Design, install, operation and maintenance of an on-site WPG system comprising one or more turbines with a power output in the range 300 kW – 2 MW, with a height of 40 – 80 m. This system provides electricity for consumption on-site.
EPC, BOT or PPA type contracts
Decommissioning or re-commissioning of the turbine(s) at the end of agreed lifetime.